The condition
High-value glazing assemblies showed localized finish damage and punch-list conditions after construction and installation.
Start a project
9 project photographsWindow + door punch-out before turnover
Precision window and door finish touch-ups completed before handover of a custom coastal residence.
High-value glazing assemblies showed localized finish damage and punch-list conditions after construction and installation.
AMF isolated the affected areas, matched the existing finish and performed specialty touch-up work around completed interiors and exteriors.
The corrected components were prepared for homeowner turnover without replacement of the installed windows and doors.
Scope + system
Complete project gallery
Open any image for a full-screen view, then use the arrows or thumbnail strip to move through every photograph supplied for this project.