The condition
Completed architectural elements required a color correction after installation, with surrounding façade, glazing and finished surfaces already in place.
Start a project
5 project photographsCorrective color-change refinish
A corrective color change executed on installed storefront and architectural metal at the first pickleball stadium project.
Completed architectural elements required a color correction after installation, with surrounding façade, glazing and finished surfaces already in place.
AMF protected the adjacent work, prepared the existing finish and completed a controlled color-change refinish in the field.
The installed metal was brought into alignment with the corrected design direction without replacement.
Scope + system
Complete project gallery
Open any image for a full-screen view, then use the arrows or thumbnail strip to move through every photograph supplied for this project.