The condition
Door and storefront assemblies required finish correction while adjacent glazing, flooring, walls and interior spaces remained protected.
Start a project
7 project photographsStorefront refinish
A detailed storefront refinish completed in place at a finished hospitality property.
Door and storefront assemblies required finish correction while adjacent glazing, flooring, walls and interior spaces remained protected.
AMF created a controlled work area, protected each adjacent surface and refinished the installed framing and doors.
The completed assemblies present a clean, consistent appearance without replacement of the glazing system.
Scope + system
Complete project gallery
Open any image for a full-screen view, then use the arrows or thumbnail strip to move through every photograph supplied for this project.